7 1 7 4 5 6
|| Corrigendum - 1 for Sealed quotation for Printing & Designing of five hundred copies of Annual Report for WBHDCL on per page basis || Corrigendum-1 for Construction of road shoulder and installation of different traffic apparatus at different crossing location of Barrackpore-Kalyani Expressway from Moragacha Crossing (Ch 0.00 KM) to Kampa Crossing (Ch 30.00 KM) Phase-I- || Corrigendum-1Collection of toll on Barrackpore Kalyani Expressway in the District of North 24 Pgs and Nadia (KM- 0.00 TO KM 34.542) at existing Toll Gates No-1 near Sodepur More, Toll Gate No-2 near Wireless More and Toll Gate No-3 near Kampa More.(2nd call) || Construction of Road Shoulder and installation of different traffic appurtenances at different locations of Barrackpore-Kalyani Expressway from Moragacha Crossing (Ch 0.00 Km) to Kampa Crossing (Ch 30.00 Km) Phase-I. || Collection of User Fee on BK Expressway in the Dist. of North 24 Pgs and Nadia at existing User Fee Collection Plaza at -i) Gates No-1 near Sodepur More ii) Gate No-2 near Wireless More and iii) Gate No-3 near Kampa More.(2nd call) || Minutes of Pre-Bid Conference Held on 09th August,2016,In Principal approval of General Arrangement Drawing (GAD) of proposed ROB in lieu of Level Crossing 1A/3T at Bandel Carshed is also attached here with(CIV/WORKS/01/16-17 dated 08.07.2016) || CORRIGENDUM-III and revised Bill of quantities (BOQ)for Construction of Road over Bridge (ROB) including Service Road, Footpath, Road Signage, Drainage etc. in lieu of Level Crossing 1A/3T at Bandel carshed on Bandel-Katawa Broad Gauge Rail Line, at Chainage 632.5 KMP on Grand Tank Road in the District of Hooghly in West Bengal. (NIT No: CIV/WORKS /01/16-17) date: 08.07.2016 || Corrigendum-VIII for Package-III

Current Notice

Message From

Managing Director's Desk

Shri Manoj Kumar Agarwal IAS
Managing Director of WBHDCL

Admin Login

Road Sign

Webmail

Media Corner